DATA CENTER

Many data center operators are deploying their racks and power systems using the following architecture: racks are installed in server rooms, while a centralized UPS cabinet, connected to a large bank of lead-acid batteries, occupies a significant amount of valuable floor space.


Our rack-mounted distributed power solution equips each rack with its own power unit and lithium battery, freeing up the space previously allocated for lead-acid batteries and offering enhanced reliability.


For many existing data centers with rack power capacities up to 10KW, originally designed for cloud servers, accommodating the higher power demands of new AI computing GPU servers poses a challenge. Our solution seamlessly upgrades existing racks by installing our high-power density DPS unit, ensuring they can meet the increased power consumption requirements of GPUs.